Control over design changes must be established if flight line activity disruption is to be lessened, and responsibility for it rests with manufacturing and engineering divisions; three basic types of changes, mandatory, necessary, and facility, are discussed; education of flight line supervision; how to improve transmission of data; flight checkout.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Flight line disruption


    Additional title:

    Soc Automotive Engrs -- J


    Contributors:


    Publication date :

    1956


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    FLIGHT SCHEDULE DISRUPTION AWARENESS SYSTEMS AND METHODS

    SMALL GREGORY JOHN / STOJKOVIC GORAN / MORALES FRANK R et al. | European Patent Office | 2019

    Free access

    FLIGHT SCHEDULE DISRUPTION AWARENESS SYSTEMS AND METHODS

    SMALL GREGORY JOHN / STOJKOVIC GORAN / MORALES FRANK R et al. | European Patent Office | 2019

    Free access

    Flight schedule disruption awareness systems and methods

    SMALL GREGORY JOHN / STOJKOVIC GORAN / MORALES FRANK R et al. | European Patent Office | 2019

    Free access

    Flight schedule disruption awareness systems and methods

    SMALL GREGORY JOHN / STOJKOVIC GORAN / MORALES FRANK R et al. | European Patent Office | 2019

    Free access

    Flight disruption impact assessment based on expert system

    Liang, Bingjie / Wang, Fujun / Bi, Jun | SPIE | 2023