Three-year program to remove 100 mi of street car tracks in District of Columbia includes cover and removal of tracks; covering of tracks and resurfacing of Pennsylvania Avenue included welding manhole covers to be abandoned and application of binder on 20-ft-wide area of old tracks; 3×3/8 in. steel plate was welded to existing center rail slot.
Nation's parade route gets new surface
Pub Works
Public Works ; 95 , n 1
1964
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hit parade de la tenue de route
Automotive engineering | 1996
|IuD Bahn | 2006
|Engineering Index Backfile | 1941
Engineering Index Backfile | 1940
Engineering Index Backfile | 1942
|