Scheme includes construction of new floating landing stage 640 ft. long, and also new floating roadway to transport vehicular traffic from new stage to shore; new landing stage is steel-frame structure carried on 38 pontoons; floating stage has 27 new pontoons and is kept in position by moorings from various compressors or mooring bitts.
Landing stage improvements at Seacombe Ferry
Engineering
Engineering ; 122 , n 3173
1926
5 pages
57 Figs. Partly on Supp. plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Ferry landing for railway transports
Engineering Index Backfile | 1885
Happy (ferry) landings - Motion-Free Ferry Landing promises passengers a safer embarkation
Online Contents | 2002
Three-track-car-ferry landing; Wabash Railway
Engineering Index Backfile | 1928
|