Tests made to determine behavior of number of welded rails 84 and 108 m. in length; concludes that welding may possibly cut down maintenance cost (rail splices, etc.) 75 per cent, but admits that much more experimental work is necessary before such conclusion is definitely justified.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Rail welding for Nurnberg railway administration


    Additional title:

    Schienenschweisssungen bei der Reichsbahndirektion Nurnberg


    Contributors:
    Scho&die (author) / nberger (author)


    Publication date :

    1925


    Size :

    8 pages


    Remarks:

    12 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    German


    Keywords :



    Highway-railway rail welding vehicle

    ZHANG XIANBIN / YIN XIANGYANG / WANG YAN et al. | European Patent Office | 2025

    Free access

    Railway rail induction-welding device

    European Patent Office | 2016

    Free access


    Highway-railway rail welding vehicle and switching method

    FAN PINGQING / ZOU FANGXIANG / XIE CHAO et al. | European Patent Office | 2024

    Free access