Connection of locomotive terminals with stations and other railway plants; plant of tracks for terminals, and building and machinery equipment; switching service; principles for design of locomotive-handling plants; dependence of general layout and local conditions; locomotive tracks; plan of tracks for locomotive stations and buildings and equipment; distribution of machinery equipment and sections of shop. (See also - nos. 9 Oct. 1 1925, pp. 132-136, no. 10 Nov 1, 15 165-170, 181-183)
Locomotive handling plants of the German state railway
Die Lokomotivbehandlungsanlagen der Deutschen Reichsbahn
Glasers Annalen ; 97 , n 11
1925
12 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Four-system locomotive for German railway
Engineering Index Backfile | 1967
2CI standard express locomotive of the German state railway
Engineering Index Backfile | 1926
|Standardization of the A.C. Locomotive of the German State Railway
Engineering Index Backfile | 1927
|Production methods in railway locomotive plants
Engineering Index Backfile | 1921
The Schmidt high-pressure locomotive of the German state railway company
Engineering Index Backfile | 1929
|