Twin headings used to marked advantage at East portal; stresses in soft ground at West portal; timber lining required; development of Lewis traveling cantilever needle bar or girder.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Work on moffat tunnel forging ahead


    Additional title:

    Ry. Age


    Contributors:
    Betts, C.A. (author)

    Published in:

    Railway Age ; 81 , n 19


    Publication date :

    1926


    Size :

    4 pages


    Remarks:

    7 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Work on moffat tunnel now in full progress

    Engineering Index Backfile | 1924


    Construction of the Moffat tunnel

    Gabelman, C.G. | Engineering Index Backfile | 1928


    The Moffat tunnel through the Rocky Mountains

    Engineering Index Backfile | 1926


    Fighting rail corrosion in 6.21-mile Moffat tunnel

    Jones, W.C. | Engineering Index Backfile | 1938