Basic requisites examined with particular reference to experience of Canadair Ltd in production of North American F-86 Sabre fighters and Lockheed T-33 and T-36 training aircraft; subject is considered under four headings of plans, plant, policy and people; fitting of plant and policy to plan and interaction between these three factors and human factor is shown to be of prime importance, if economic production on schedule is to be achieved.
Prerequisites for production
Aircraft Production
Aircraft Production ; 15 , n 181
1953
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
|Prerequisites of street railroads
Engineering Index Backfile | 1934
|SAE Technical Papers | 1946
|Prerequisites for Space Drive Science
AIAA | 2009
|Prerequisites to Improve Traffic Safety
British Library Conference Proceedings | 2002
|