Shipping space saved by putting together in Chevrolet's assembly plants passenger car frames delivered in knockdown condition; riveting and other operations on components; method also applied to manufacture of trucks.
Frame assembly cuts shipping costs
Steel
Steel ; 132 , n 18
1953
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bumper-wrapping machine cuts packing, shipping costs
Engineering Index Backfile | 1953
Tema Archive | 1973
|Engineering Index Backfile | 1927
|Engineering Index Backfile | 1929