Considerable savings in time, labor and material made possible by introduction of new methods and equipment for renewal of conductor rails; with new equipment gang of six men can unload 1 3/4 mi of rail in 4 1/2 hr, and 16 men can lay-in and bond 1/2 mi of rail in similar time.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Installation of long conductor rails on southern region


    Additional title:

    Engineer


    Published in:

    Engineer ; 195 , n 5067


    Publication date :

    1953


    Size :

    2 pages


    Remarks:

    Illustrations


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Conductor rails

    Onslow, D.V. | Engineering Index Backfile | 1941


    CONDUCTOR RAILS

    European Patent Office | 2019

    Free access

    Conductor Assembly for Rails

    ZAREMBA CHAD / MOST TOBIN / SKOCDOPOLE JOHN et al. | European Patent Office | 2024

    Free access

    Under-contact conductor rails

    Engineering Index Backfile | 1924


    Connector for conductor rails

    TEMBAAK PHILIP | European Patent Office | 2016

    Free access