Drilling operations at 2 locations in Cook Inlet, Alaska; at shallow water location, platform-tender combination is being utilized; platform is anchored by pilings driven through 4 legs to between 88 and 110-ft into ocean floor; platform jacket is 45-ft high; designed for 4 wells; platform is equipped with 4-well derrick that will permit 4 holes to be drilled by skidding crown block; at deep Cook Inlet location is Western Offshore No. II, drilling ship.
Pan am cook inlet plans
Petroleum Mgmt
Petroleum Management ; 34 , n 9
1962
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
NTIS | 2000
Spill control boat for Cook Inlet
Online Contents | 1994
Innovations drive pipeline installation in Cook Inlet
Tema Archive | 2003
|Simulating Ice Drift in Cook Inlet, Alaska
British Library Conference Proceedings | 2001
|Reassessment of Platforms in Cook Inlet, Alaska
British Library Conference Proceedings | 1995
|