New 330-m quay wall was completed with 337 100-ton reinforced blocks; when filled in with sand, quay will have width of 150 m; work was done on crown of breakwater and breastworks; main mole will be extended by 100 m, giving total length of 1300 m; plans for oil tanker wharf are in hand; port equipment is also noted.
Port of tangier
Dock Harbour Authority
Dock and Harbour Authority ; 43 , n 506
1962
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
"Mons Calpe" for Fibraltar-Tangier service
Engineering Index Backfile | 1954
"Mons Calpe" for Fibraltar-Tangier service
Engineering Index Backfile | 1954
"Mons Calpe" for Gibraltar-Tangier service
Engineering Index Backfile | 1954
"Mons Calpe" for Fibraltar-Tangier service
Engineering Index Backfile | 1954
TANGIER, THE NAVY AND ITS CONNECTION WITH THE GLORIOUS REVOLUTION OF 1688
Taylor & Francis Verlag | 1987
|