In two old structures 90,000 ft of flooring has been replaced with newly developed edge grain laminated oak; hatchways along one side of each pier permit cargo handling with ships' tackle directly to and from dock floor through use of 30° angle doors; three movable steel crossover bridges to span depressed tracks in pier center, better fire protection, and modern lighting also installed.
To promote traffic [midline ellipsis] reading rehabilitates tidewater piers
Ry Age
Railway Age ; 133 , n 25
1952
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1952
Engineering Index Backfile | 1939
Engineering Index Backfile | 1945
Speedometer [midline ellipsis] for use at high traffic flows
Engineering Index Backfile | 1955
|"In my opinion [midline ellipsis] "
Engineering Index Backfile | 1947