Report of subcommittee of Special Committee on Continuous Welded Rail of American Railway Engineering Association, based on data received in reply to questionnaire submitted to 10 railroads which had installed in excess of two miles of welded track, exclusive of tunnels; it covers first cost, maintenance cost, life and salvage value of both types of rail.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    What savings from butt-welded rail?


    Additional title:

    Ry Track Structures


    Published in:

    Publication date :

    1953


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Residual stresses in flash butt welded rail

    Cai, Zhipeng / Nawafune, Masashi / Ma, Ninshu et al. | Tema Archive | 2011


    Drydock butt welded underwater

    Wolfe, I. | Engineering Index Backfile | 1964


    Rail butt joint anti-falling mechanism, butt joint rail assembly and control method

    DU BAOBAO / MIAO FENG | European Patent Office | 2023

    Free access

    Fatigue of butt-welded steel pipes

    Scavuzzo, R.J. / Srivatsan, T.S. / Lam, P.C. | Tema Archive | 1998


    RAIL BUTT ELECTRICAL INSULATION CONNECTION

    SHTEINBERG ROMAN LVOVICH / SOLODUKHIN VLADIMIR IVANOVICH / GRUNIN SERGEI ALEKSANDROVICH et al. | European Patent Office | 2021

    Free access