Traffic on California logging railroad carried by structure designed as false-work for erecting 120-ft. girders.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Two-hinged timber arch used as temporary railroad bridge


    Additional title:

    Eng. News-Rec


    Contributors:

    Published in:

    Publication date :

    1922


    Size :

    2 pages


    Remarks:

    5 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Field Studies of Strengthened Timber Railroad Bridge

    Gutkowski, Richard M. | Online Contents | 2001


    Field Studies of Strengthened Timber Railroad Bridge

    Gutkowski, Richard M. / Shigidi, Abdalla M. T. / Tran, An Vinh et al. | Transportation Research Record | 2001


    Reinforcing brick arch bridge under railroad traffic

    McGilvra, R.D. | Engineering Index Backfile | 1944


    Masonry arch railroad bridge 213 ft. span

    Engineering Index Backfile | 1893


    Z-Spike Rejuvenation to Salvage Timber Railroad Bridge Members

    N. J. Miller / R. M. Gutkowski / J. Balogh et al. | NTIS | 2008