Signaling is arranged on a 2-min. service, but actually is based on interval between trains of 100 sec. Notes on overlaps; light signals; color-light signals; track transformers, relays, etc.; train stops; and emergency crossover roads.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    The re-signalling at the Liverpool overhead railway


    Additional title:

    Engineer


    Published in:

    Engineer ; 132 , n 3436 ; p 488-489


    Publication date :

    1921


    Size :

    2 pages


    Remarks:

    3 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Liverpool overhead railway

    Engineering Index Backfile | 1949


    Liverpool overhead railway

    Cottrell, S.B. | Engineering Index Backfile | 1896


    Liverpool overhead railway

    Cottrell, S.B. | Engineering Index Backfile | 1896


    Liverpool overhead electric railway

    Engineering Index Backfile | 1902


    The Liverpool overhead railway

    Engineering Index Backfile | 1902