Shifting 15 miles of double-track railroad around Huffmann dam, Miami Conservancy District, required excavating 657,000 yd., mostly rock in one cut 120 ft. deep, placing 390,000 yd. embankment. Cost more than $3,237,000.
Costly railroad re-location
Cement Eng. News
Cement and Engineering News ; 34 , n 2
1922
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1910
|Engineering Index Backfile | 1894
|Engineering Index Backfile | 1888
|Engineering Index Backfile | 1946
|Engineering Index Backfile | 1893
|