How data developed by transportation department of Brooklyn surface lines are used to follow trend of service requirements and adjust schedules accordingly so that losses may be avoided and that as much service as will be purchased is always available.
Fitting service to traffic in Brooklyn
Elec. Ry. Jl
Electric Railway Journal ; 60 , n 27
1922
6 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Traffic capacity of Brooklyn Bridge
Engineering Index Backfile | 1890
Brooklyn bridge rebuilt for today's traffic
Engineering Index Backfile | 1951
Traffic conditions on the Brooklyn rapid transit system
Engineering Index Backfile | 1904
|Traffic on the Brooklyn Bridge, New York City
Engineering Index Backfile | 1909
|The traffic difficulties of the Brooklyn rapid transit system
Engineering Index Backfile | 1900