Recommended plan includes approximately 47 mi of dual-track, grade-separated rail rapid transit routes with approximately 32 stations, 24 mi of grade separated right-of-way for future extension of rail rapid transit routes, 90 mi of express bus routes operating on freeways in mixed traffic, and over 500 mi of local bus routes operating on major arterials.
Seattle's Rapid Transit Plan
Western Construction
Western Construction ; 43 , n 1
1968
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1915
Engineering Index Backfile | 1914
|Seattle's unsinkable Houseboats
TIBKAT | 1977
|Engineering Index Backfile | 1954
|Engineering Index Backfile | 1929