Line capacity for transporting 30,000 bbl. of crude oil daily being increased to 50,000 bbl.; its total length from Mamonal terminal on Caribbean Sea to El Centro oil field is approximately 330 miles; line has been constructed with welded steel pipe of 10-in. diameter.
Colombia's great pipeline
Petroleum Times
Petroleum Times ; 17 , n 435
1927
2 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1995
Colombian concessions: Colombia's rail network revived
British Library Online Contents | 1998
New ownership - Will new owners of Colombia's mines mean boost in exports?
Online Contents | 1997
A survey of Colombia's new outer space policy: Reforms in Colombian law
Online Contents | 2008
|