Results obtained in 1 year of electric operation; analysis of different items; comparison with costs of steam operation; total amount saved nearly $200,000. See also Elec. Ry. and Tramway Jl., vol. 56, no. 1399, May 13, 1927, pp. 277-282, 5 figs.; and Ry. Engr., vol. 49, no. 573, Nov. 1927, p. 425. (see also Elec. Traction, vol. 23, no. 1, Jan. 1927, pp. 7-8, 1 fig.)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    The electrification of the Spanish Northern railway reduces operating costs


    Additional title:

    Gen. Elec. Rev


    Contributors:

    Published in:

    Publication date :

    1926


    Size :

    7 pages


    Remarks:

    7 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English





    Spanish railway electrification

    Engineering Index Backfile | 1937


    The 3000-volt electrification of the spanish northern railway

    Totten, A.I. / Hutchinson, H.C. | Engineering Index Backfile | 1924


    Great Northern Railway electrification in the cascades

    Moreland, E.L. / Booth, R.D. | Engineering Index Backfile | 1928


    The northern Spanish railway

    Cubillo, L. | Engineering Index Backfile | 1905