Way maintenance is coordinated with municipal paving program; T-rail is standard; flangeways are formed by granite blocks set in rich concrete; pavement between rails has extremely low crown.
Extensive annual track reconstruction done by Connecticut company
Elec. Ry. Jl
Electric Railway Journal ; 69 , n 16
1927
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Extensive yearly program of track reconstruction carried out at Providence
Engineering Index Backfile | 1931
|Traffic improvements of the Connecticut Company
Engineering Index Backfile | 1913
Way construction of the Connecticut company
Engineering Index Backfile | 1913
Hartford trackwork of the Connecticut company
Engineering Index Backfile | 1912