Australian system of maintenance and results of study of reasons for unscheduled removals of units; probability of unscheduled removal, derived from investigation data, used as criterion for assessment of optimum period between scheduled overhauls; probability of failure is greatest immediately after overhaul.
Maintenance plan for airborne radio equipment
Inst Radio Engrs -- Trans Professional Group Aeronautical Navigational Electronics
1954
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Principles of Integration of Airborne Radio-Electronic Equipment
Springer Verlag | 2021
|Decentralized maintenance plan
Engineering Index Backfile | 1928
|Joint Processing of Information in Integrated Airborne Radio Electronic Equipment
Springer Verlag | 2021
|MAINTENANCE WORK PLAN SUPPORT DEVICE AND MAINTENANCE WORK PLAN SUPPORT METHOD
European Patent Office | 2021
|