In order to provide better roads, in vicinity of Fort Leonard Wood, 12 miles of U S 66 is being improved from winding route with single traffic lane each way to four-lane divided highway; maximum grades are restricted to 5.7%, horizontal curves are limited to 2° and sight distances to 1000 ft horizontally and 800 ft vertically.
How Missouri builds access roads
Eng News-Rec
Engineering News-Record ; 129 , n 13
1942
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Missouri Pacific builds coal transfer on Mississippi
Engineering Index Backfile | 1953
Lagan builds roads in the Caribbean
British Library Online Contents | 2008
Missouri pacific builds large water supply and softening plant
Engineering Index Backfile | 1923
Consolidated clay-aggregate roads in Missouri
Engineering Index Backfile | 1941
|Investigation of oil-treated earth roads in Missouri
Engineering Index Backfile | 1931
|