Excerpts from Report on Operations during year ended Mar 31 1941; project consists in widening of more important curves to minimum of 700 ft and widening of certain tangents from 450 to 550 ft, all to depth of 35 ft at extreme low water of 1934; it also includes realignment of certain portions of Ship Channel. From Annual Report, Can Dept Transport, Ottawa.
River St. Lawrence Ship Channel
Dock Harbour Authority
Dock and Harbour Authority ; 22 , n 258
1942
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
River St. lawrence ship channel
Engineering Index Backfile | 1915
The improvement of the St. Lawrence River ship channel
Engineering Index Backfile | 1904
St. Lawrence ship channel improvements
Engineering Index Backfile | 1913
|Engineering Index Backfile | 1929
|Water levels in St. Lawrence ship channel
Engineering Index Backfile | 1937