Illustrations and description of cutting and welding equipment and methods which have made possible record breaking ship construction program in United States.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Says shipyard superintendent: "we couldn't have high-speed ship production -- Without oxyacetylene!"


    Additional title:

    Pac Bldr Engr


    Contributors:
    Pulley, G. (author)

    Published in:

    Publication date :

    1942


    Size :

    5 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Passenger ship from Hungarian shipyard

    Engineering Index Backfile | 1955


    First ship from new arendal shipyard

    Engineering Index Backfile | 1963


    Shipyard welding - applicability of firecracker welding to ship production

    Brayton, W.C. / Evans, R.M. / Neister, R.P. | Tema Archive | 1975



    Lake shipyard methods of steel ship construction

    Curr, Robert | Engineering Index Backfile | 1906