Report on visit to prominent shipyards on North-East Coast; ships inspected more closely included modern steam driven tanker of 12,000 tons deadweight carrying capacity, standard tramp steamer of 10,000 tons deadweight, and motor ship for refrigerated cargoes, having about same deadweight capacity.
British shipbuilding and war effort
Engineer
Engineer ; 173 , n 4494
1942
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British mercantile shipbuilding effort
Engineering Index Backfile | 1940
British mercantile shipbuilding effort
Engineering Index Backfile | 1941
British mercantile shipbuilding effort
Engineering Index Backfile | 1943
Engineering Index Backfile | 1940
Engineering Index Backfile | 1943
|