Pipes joined together on bank and floated into position to overcome difficulty of crossing waterway limited to one tide; design of pipes, excavation of trench, and floating and sinking pipe are discussed.
36 in. water main crossing under Tidal Creek
Water Water Eng
Water and Water Engineering ; 44 , n 552
1942
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Modelling of the initiation and development of tidal creek networks
British Library Online Contents | 2013
|Tidal Creek Extraction from Airborne LiDAR Data Using Ground Filtering Techniques
Springer Verlag | 2020
|British Library Conference Proceedings | 1995
|British Library Conference Proceedings | 2018
|A Numerical Model Study for Development of a Harbour Layout in a Creek with Wide Tidal Flat
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2010
|