Techniques used by Chesapeake and Ohio to install twin Multi-Plate culvert pipes inside arches; because of close clearances, pipes were erected outside arches and pulled into position on tracks laid through them; cofferdams were built around work area of each pipe because of troubles experienced with high water; one line of pipe was built at time, other opening serving as waterway.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Huge multi-plate pipes are threaded into old twin arches


    Additional title:

    Ry Track Structures


    Published in:

    Publication date :

    1963


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :



    Optimization of Clutch Cover Mounting Base Plate Through Twin Threaded Grub Screw

    Babu, T. V. B. / Anbazhagan, R. / Sathiyamoorthy, V. et al. | Springer Verlag | 2018


    Sewer pipe Huge sanitation project relies on GRP pipes

    British Library Online Contents | 2012


    Threaded plate fixing escalator main machine

    XIE LANQING / LU QIRONG | European Patent Office | 2015

    Free access

    "Horseshoe" concrete arches

    Luten, Daniel B. | Engineering Index Backfile | 1906