Account of north centrally located airport job completed in 1942 which is notable for construction progress in spite of frequent rains, and for difficult subgrade conditions corrected under intensive soils laboratory guidance; California method of designing flexible pavements used; field is designed to serve army technical training school; layout includes four 150-ft runways 5260 to 5640 ft in length, built to carry medium planes, plus several 50-ft taxiways and 400-ft apron.
Speed in spite of 86 rainy days
Roads Streets
Roads and Streets ; 86 , n 3
1943
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
WHAT DO CONTRACTORS DO ON RAINY DAYS?
British Library Online Contents | 2001
Vehicle rapid speed reduction auxiliary device with anti-skid effect in rainy days
European Patent Office | 2021
|