Illustrated description; shed to new depot is double-ended with connections to LNER main line at both ends; 60 locomotives can be accommodated on 10 tracks within shed; at east end, 70 ft preparation pits are installed on each shed road; vacuum operated 70 ft turntable installed; coaling plant of 250 tons capacity, capable of refueling locomotive with 8 tons of coal in 3-min provided. (See also - editorial comment 332)
L.N.E.R. new locomotive depot in North Midlands
Ry Gaz
Railway Gazette ; 79 , n 14
1943
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New L.N.E.R. locomotive depot in north east
Engineering Index Backfile | 1922
L.N.E.R. locomotive conversions
Engineering Index Backfile | 1942
L.N.E.R. locomotive conversions
Engineering Index Backfile | 1942
L.N.E.R. locomotive conversion
Engineering Index Backfile | 1943
L.N.E.R. locomotive conversion
Engineering Index Backfile | 1943