Train delays eliminated by new project between Van Buren and Ft. Smith, Ark; track layouts involved; crossing and power switch at Van Buren; control of CTC machine and automatic block signaling; details of apparatus; power supply.
Junction and crossing included in centralized traffic control on Missouri Pacific
Ry Signaling
Railway Signaling ; 36 , Part 1, n 1
1943
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Centralized traffic control on Missouri pacific
Engineering Index Backfile | 1941
Centralized traffic control on Missouri pacific
Engineering Index Backfile | 1941
C.T.C. at junction and crossing on Missouri Pacific
Engineering Index Backfile | 1943
Missouri pacific installs centralized traffic control on 32 miles of double track
Engineering Index Backfile | 1931
Canadian pacific installs centralized traffic control
Engineering Index Backfile | 1944