Article is based on report on tests conducted by Welding Engineering Dept of Calif Shipbuilding Corp for purpose of studying fleet fillet welding technique prposed by Lincoln Electric Co and approved by Am Bureau of Shipping; equipment; material; procedure; initial tests; confirmation tests; current and weld strength; qualification of welding operators.
Shipbuilder and seaman training
Pac Mar Rev
Pacific Marine Review ; 40 , n 4
1943
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2010
|Engineering Index Backfile | 1930
|TIBKAT | 146.1962 - 209.2008/09,[5] = Nr. 3282-4244; 209.2008/09,[6/7] = Nr. 4244; 209.2008/09,[8-10] = Nr. 4245-4247; 209.2008/09,[11/12] - 210.2009/10 = Nr. 4247-4257; 210.2010/11=Nr. 4258-4267; 211.2011/12 - 214.2014 = Nr. 4268-4303
Shipbuilder installs new equipment
Engineering Index Backfile | 1932
|Structural engineer assists shipbuilder
Engineering Index Backfile | 1942
|