Barrage from Clacton to Margate, estimated construction cost of £250 million, proposed for Europort and new townsite on landfill to alleviate London congestion and improve port facilities; polders and dams to use on site materials for fills; reclaimed land to be site of new London airport and highway system; besides becoming recreation areas, planned lakes will reduce salinity of Essex-Kent water tables. (See also Surveyor v 126 n 3829 Oct 23 1965 p 25-6)
Thames barrage could offer new docks, motorway route and housing sites
Chartered Surveyor
Chartered Surveyor ; 98 , n 6
1965
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Thames barrage could offer new docks, motorway route and housing sites
Engineering Index Backfile | 1965
|Engineering Index Backfile | 1963
|Thames Clippers expands route network
Online Contents | 2003
Online Contents | 1998
Engineering Index Backfile | 1933