Bethlehem steel plant uses hard ore which is transported from El Pao via railroad and waterways; four 30-car trains make daily trip to Palua; to provide ore loading service throughout 43 ft river range, floating wharf is in use; data on unloading procedure.
Bethlehem moves first Venezuelan iron ore
Eng News-Rec
Engineering News-Record ; 147 , n 2
1951
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Description of the works of the Bethlehem Iron Co.
Engineering Index Backfile | 1889
|Engineering Index Backfile | 1944
Bethlehem 28,000-Ton supertankers
Engineering Index Backfile | 1952
Bethlehem Hoboken yard modernized
Engineering Index Backfile | 1945
DataCite | 1970
|