By mid 1953 all important lines, totaling 850 route miles, will be electrically operated; substations and track sectioning cabins remotely controlled from nearest signalbox; operating instructions given by telephone from four central control rooms; there are normally one or two rectifiers of 1200 kw 1800 amp continuous rating with overload capacity up to 4000 amp in each substation.
Electrification programme of Netherlands Railways
Ry Gaz
Railway Gazette ; 94 , n 12
1951
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Netherlands railways electrification extension
Engineering Index Backfile | 1949
Netherlands east India state railways and electrification
Engineering Index Backfile | 1932
Engineering Index Backfile | 1929
Engineering Index Backfile | 1904
British railways electrification
Engineering Index Backfile | 1922