Author suggests four avenues of attack designed to get more output per man hour and to reduce number of man hours required, i.e., mechanization, better supervision, increasing life of materials and improving track structure. Before New England Railroad Club, Boston, Mass.
Offsetting high cost of M/W labor
Ry Age
Railway Age ; 130 , n 4
1951
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
NTRS | 1976
Offsetting engines out of axis
Engineering Index Backfile | 1921
|Automobile Safetyd Devices and Offsetting Behavior: A Japanese Experience
British Library Conference Proceedings | 2000
|Offsetting torque single rotor helicopter by discharging air
European Patent Office | 2019
|