System installed on 42 mi of single track and 1 mi of double track between Montpelier, Ohio, and New Haven, Ind; project includes power operated switches and controlled signals at ends of four passing tracks, namely, Blakesley, Butler, Spencerville and Grabill, capacities of which are 120, 170, 123 and 115 cars, respectively.
C.T.C. on Wabash
Ry Signaling Communications
Railway Signaling and Communication ; 43 , n 10
1950
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Maintenance of C.T.C. on Wabash
Engineering Index Backfile | 1932
Engineering Index Backfile | 1943
Engineering Index Backfile | 1947
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1943