Freight yard opened at St Luc, Montreal, replaces existing yards of Outremont, Sortin, and Hochelaga; hump retarder yard with 75 mi of track, equipped with push button control; terminal consists of three major yards, as well as storage and repair tracks; diagram shows layout. (See also Ry Signaling and Communications v 43 n 11 Nov 1950 p 712-9; Engineering v 170 n 4431 Dec 29 1950 p 553-5)
Canadian Pacific builds new yard
Ry Gaz
Railway Gazette ; 93 , n 23
1950
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Canadian Pacific builds new yard
Engineering Index Backfile | 1950
Canadian Pacific builds new yard
Engineering Index Backfile | 1950
Canadian yard builds large offshore rig for north sea use
Tema Archive | 1975
Canadian pacific railway unit yard Montreal
Engineering Index Backfile | 1950
|Michigan Central builds large classification yard
Engineering Index Backfile | 1920