To expedite shipping of 500 items produced at six surgical dressing plants of Johnson and Johnson, shipping center with 207,000 gross sq ft of floor space has been built on 58-acre plot outside of New Brunswick; underground drag line system pulls especially designed 4-wheel trucks along aisles where merchandise is stacked in shipping cartons on pallets; sections are numbered along aisles for quick location by order assemblers.
New shipping center speeds customer service and reduces shipping costs
Mill Factory
Mill and Factory ; 45 , n 5
1949
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1927
|Wiley | 2011
|Monorail system speeds rolls to shipping
Engineering Index Backfile | 1961
Engineering Index Backfile | 1929
New terminal speeds freight service -- Reduces costs
Engineering Index Backfile | 1950