On route to Los Angeles, Calif, Union Pacific has completed installation of centralized traffic control on 324.5 mi of single track between Salt Lake City, Utah, and Caliente, Nev, which is connected at Caliente with similar installation extending to Daggett, Calif, 300.9 mi, completed in 1943, so that entire 625.4 mi, in one continuous section, is operated by signal indication under CTC control. (see also Ry Signaling and Communications v 42 n 12 Dec 1949 p 798-805)
Union Pacific equips 625-mile line with C.T.C.
Ry Age
Railway Age ; 127 , n 27
1949
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Union Pacific equips 625-mile line with C.T.C.
Engineering Index Backfile | 1949
Engineering Index Backfile | 1952
Engineering Index Backfile | 1953
Engineering Index Backfile | 1944
Western Pacific installs C.T.C. on 116-mile subdivision through Feather River Canyon
Engineering Index Backfile | 1945