Requirements for construction of runway for heavy planes; good solution is to increase flexibility of concrete layer rather than to increase thickness; use of shallow rubber water bags under concrete layer suggested; construction costs and durability of bags; test results.
Water-borne runway
ASCE -- Proc (J Air Transport Div)
1958
32 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Runway Safety - Runway Safety Deficiencies
Online Contents | 2009
|RUNWAY MAINTENANCE APPARATUS, RUNWAY MAINTENANCE SYSTEM AND RUNWAY MAINTENANCE METHOD
European Patent Office | 2024
|