Analysis of costs of electric and steam operation over a period of five years on Brazil's important main-line railway; electrification expected to save as high as 65 per cent of total operating cost.
Savings from the Paulista electrification estimated
Elec. Ry. Jl
Electric Railway Journal ; 62 , n 18
1923
3 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Paulista railway electrification
Engineering Index Backfile | 1934
The Paulista railway electrification
Engineering Index Backfile | 1921
|The Paulista railway electrification
Engineering Index Backfile | 1921
|Electrification of the Paulista railroad in Brazil
Engineering Index Backfile | 1928
|Economies effected by the electrification of the Paulista railway
Engineering Index Backfile | 1927
|