Five electropneumatic interlockers and 79 color-light signal is installed in record time.
Signaling of the Frankford elevated
Ry. Signal Engr
Railway Signal Engineer ; 16 , n 5
1923
6 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
A Discussion of the SEPTA - Frankford Elevated Reconstruction Project (FERP)
British Library Conference Proceedings | 1995
|Frankford Transportation Center
British Library Conference Proceedings | 2005
|Automatic Train Control for Septa's Market Frankford Subway Elevated Line
British Library Conference Proceedings | 1995
|Online Contents | 1995
British Library Conference Proceedings | 1997
|