Description of continuous railway highway grade separation project 3. 51 mi long, involving two adjoining railroads and costing $4, 280,000, completed in 1942; history of undertaking previous to its construction. (see also Ry Age v 116 n 6 Feb 5 1944 p 307-10)
Grade separation at Winnetka, Illinois
Western Soc Engrs -- J
Western Society of Engineers -- Journal ; 49 , n 1
1944
13 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Grade separation at Winnetka, Illinois
Engineering Index Backfile | 1944
|Grade reduction on the Illinois Central
Engineering Index Backfile | 1903
Grade reductions on the Illinois Central in Tennessee
Engineering Index Backfile | 1899
Grade reduction on the Kentucky division of the Illinois Central
Engineering Index Backfile | 1915
|British Library Conference Proceedings | 1996
|