Description of extensive tests installed by this road in section of main line near Chicago, during last summer, to develop most satisfactory standards of construction; tests cover ties, tie plates, tie plate fastenings, rail anchors, join bolt tension, joint expansion gaps, joint lubrication, types of ballast, and other features of track construction. Before Maintenance of Way Club, Chicago. (see also Ry Gaz v 81 n 1 July 7 1944 p 11)
Twenty miles of tests on Illinois Central hold answers to many track problems
Ry Eng Maintenance
Railway Engineering and Maintenance ; 40 , n 2
1944
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Twenty miles of tests on Illinois Central hold answers to many track problems
Engineering Index Backfile | 1944
|Tests hold key to many track problems
Engineering Index Backfile | 1944
British Library Online Contents | 2002
British Library Online Contents | 2003
British Library Online Contents | 2003