Detailed description of how 8-in. water main was carried under main line of Reading Co double railroad tracks in Pennsylvania, through protecting culvert; digging, jacking and pumping equipment used.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Tunneling mains under railroad tracks


    Additional title:

    Pub Works


    Contributors:

    Published in:

    Public Works ; 75 , n 11


    Publication date :

    1944


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Laying mains under railroad tracks

    Engineering Index Backfile | 1936


    Pipe tunnels for water mains under railroad tracks

    Lenhardt, L.G. | Engineering Index Backfile | 1929


    Pipe tunnels under railroad tracks

    Lenhardt, L.G. | Engineering Index Backfile | 1930


    Design of railroad tracks

    Peter, G. / Peter, H. | Engineering Index Backfile | 1950


    Economical method of building sewers and water mains under railway tracks

    Stewart, M.D. | Engineering Index Backfile | 1949