Number of types of artistic design erected by Oregon State Highway Commission; cement rubble masonry foundations cost from ($200) to ($300) each. (see also Roads and Streets, vol. 70, no. 8, Aug. 1930, pp. 277-279, 14 figs)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Drinking fountains along Oregon highways


    Additional title:

    Pub. Roads


    Contributors:
    Davis, T.M. (author)

    Published in:

    Public Roads ; 11 , n 2


    Publication date :

    1930


    Size :

    5 pages


    Remarks:

    14 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Simple cardinal principles for roadside drinking fountains

    Mc Dermott, J.R. | Engineering Index Backfile | 1933


    Footpaths along highways

    Hay, A.K. | Engineering Index Backfile | 1933


    Fluttering fountains

    Casperson, L.W. | Online Contents | 1993


    Eradicating weeds along highways

    Martin, A.H. | Engineering Index Backfile | 1933


    Fire Fountains on Io

    Davies, A. G. / United States; National Aeronautics and Space Administration / Universities Space Research Association; Lunar and Planetary Institute et al. | British Library Conference Proceedings | 1996