Pier is semi-circular in shape, 1200 ft. long, with travel way, 36 ft. wide; construction required 245 Douglas fir piles, ranging in length from 40 ft. to 95 ft.; piling and timber were treated under pressure with coal-tar creosote. (See also Wood Preserving News vol. 7, no. 1, Jan. 1929 pp. 14-16, 3 figs)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Creosoted Douglas fir pier completed at Redondo beach, California


    Additional title:

    Port Terminal


    Published in:

    Publication date :

    1929


    Size :

    2 pages


    Remarks:

    3 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Redondo Beach, California, 1992-1994 Wave Data

    Sabol, Margaret A. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1996

    Free access

    King Harbor, Redondo Beach, California, Breakwater Stability Study

    Smith, Ernest R. / Dubose, Willie G. / Carver, Robert D. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1990

    Free access

    Water Wave Effects at Redondo Beach, King Harbor, California

    Hales, Lyndell Z. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1987

    Free access

    TRW (Redondo Beach, CA) Fastener Controls

    Evans, D. / National Aeronautics and Space Administration | British Library Conference Proceedings | 1995


    King Harbor, Redondo Beach, California, breakwater stability study : hydraulic model investigation

    Smith, Ernest R. / Dubose, Willie G. / Carver, Robert D. | TIBKAT | 1990