Electrified zone extends from Bombay to Poona on southeast line and from Bombay to Igatpuri on northeast line, distance of 204 mi.; power is generated at steam station near Kalyan, which has total plant capacity of 40,000 kw.; details of transmission lines, substations, overhead equipment, permanent way, and electric locomotives. (see also Ry. Gaz., vol. 51, no. 19, Nov. 8, 1929, pp. 701-706, 3 figs)
Main line electrification on the great Indian Peninsula railway
Engineer
Engineer ; 148 , n 3853
1929
4 pages
12 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Main line electrification on the great Indian Peninsula railway
Engineering Index Backfile | 1929
Electrification of suburban and certain main-line sections of Great Indian Peninsula railway
Engineering Index Backfile | 1932
|Electrification of suburban and certain main-line sections of great indian peninsula railway
Engineering Index Backfile | 1932
|Electrification of suburban and certain main-line sections of great indian peninsula railway
Engineering Index Backfile | 1932
|Electrification of the great Indian Peninsula Railway
Engineering Index Backfile | 1925