Present rail network consists of 3400 km. main lines and 1650 branch lines, of narrow and standard gage track; construction has proceeded with average of 200 km. per year; electric traction is established on 255 km. between Casablanca and Kourigha; notes on production, transmission, transformation and distribution of electric power; economic results.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Electrification of electric railroads in Morocco


    Additional title:

    L'electrification des chemins de fer du maroc


    Published in:

    Houille Blanche ; 28 , n 147-148


    Publication date :

    1929


    Size :

    4 pages


    Remarks:

    1 Fig.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    French





    Electrification of railroads

    Swope, Gerard | IEEE | 1925


    Electrification of railroads

    Goss, W.F.M. | Engineering Index Backfile | 1916


    Electrification of railroads

    Engineering Index Backfile | 1914


    Electrification of railroads

    Budd, B.I. | Engineering Index Backfile | 1929